🔥 SUPER PRIME – LFL Final Restoration & Full Functionality 🔥
🔹 CORE FOCUS: Lock down LFL’s full restoration. We’ve got media, content, logins, and emails functioning—now we finalize setup, ensure full plugin compatibility, and secure the theme. This is the last big push before we can check this off the list.
1️⃣ Where We Stand ✅
✔️ Media is fully restored – Files, images, and assets are loading correctly.
✔️ Content is in place – Posts, pages, and core data made it through the migration.
✔️ Logins are functional – Admin access confirmed, new users receiving emails.
✔️ Database tables are imported – Core site structure is intact.
2️⃣ CORE LOCKS (These Never Change)
✅ No Plugin Conflicts – Any new plugins must not break what’s already working.
✅ Security First – No legacy vulnerabilities get carried over.
✅ Full Theme Compatibility – The theme & child theme must work seamlessly.
✅ Multisite Stability – LFL must integrate perfectly within the RBM multisite setup.
3️⃣ STRATEGIC LOCKS (For the Next Few Days)
🔍 Plugin Installation & Table Validation
- Install all necessary plugins.
- Confirm database tables apply settings correctly. (Does installing plugins AFTER table import pull old settings, or do we need to manually configure?)
- Test site functionality after each major plugin is added.
🎨 Extract & Implement the Theme
- Locate the main theme & child theme in the old multisite SQL file.
- Determine dependencies (Are there required plugins for full theme functionality?).
- Ensure styling & page layouts load correctly.
⚡️ Final Testing & Optimization
- Run through key user flows. (Admin login, posting, form submissions, user interactions).
- Check database logs for errors.
- Confirm email & notifications are still functional after plugin installs.
4️⃣ ACTIVE FOCUS (What We’re Tackling Today)
🎯 Step 1: Install all essential plugins via the multisite.
🎯 Step 2: Check if plugin settings apply from imported tables.
🎯 Step 3: Extract and implement the main & child themes.
🎯 Step 4: Validate functionality—fix any conflicts or missing elements.
🎯 Step 5: Final stability check & confirmation LFL is fully operational.
🔹 FINAL OBJECTIVE: LFL = FULLY RESTORED, FUNCTIONAL & COMPLETE
📌 Once this is done, LFL is off our plate, and we move forward.
📌 RBM infrastructure will be 100% solid.
📌 We transition from cleanup to BUILD MODE.🔥 Mission is set, Captain. Ready to execute? 🚀